Commenced in February 2023 and set for completion in the second half of 2023, the One City Hill residential building is one of Canberra’s landmark urban developments. Viking Industrial was contracted by Perigon Electrical to deliver a complete standby power system for the $380 million project, ensuring reliability and compliance for such a high-profile site.
Our team supplied and installed a containerised Baudouin genset rated at 1250kVA Standby and 1150kVA Prime on the building’s 7th-floor roof — a complex installation requiring precision planning. To support the system, we also supplied a 5000L fire-rated fuel tank located in the 3rd-floor basement, complete with integrated pipework to connect the tank to the generator. This setup guarantees a steady, efficient power supply and critical backup capability for the building’s operations.


Nation-Wide Support
11 Sudbury Street, Darra, QLD 4076
74 Mordaunt Circuit, Canning Vale, WA 6155
2890 Pemberton Way, Karratha, WA 6714
4/159 Arthur Street, Homebush West NSW 2140
Lot 3 Holland Road, Cooma NSW 2630
176 Goonyella Rd Moranbah, QLD 4744 (RAM Industrial)
Unit 1/26 Baile Road, Canning Vale WA 6155
41 Bellwood St, Darra QLD 4076